mining

The Totten Mine near Sudbury, Ont., is shown on Monday, Sept. 27, 2021.THE CANADIAN PRESS/Gino Donato

33 trapped miners safe after rescue, 6 more on long trek out of mine near Sudbury

No one has been physically injured in the incident or in the evacuation

 

Juggernaut Exploration Ltd. has been given an eviction order by the Nuxalk First Nation for drilling it is doing near Bella Coola. (Juggernault Exporation photo)

B.C.’s central coast Nuxalk First Nation issue eviction order to mining exploration company

Juggernault Exploration has two drilling sites in Nuxalk territory near Bella Coola

 

Two engineers have been disciplined in connection with the Aug. 2014 tailings storage facility breach at Mount Polley Mine. This is a view of the breach repairs in 2019. (THE CANADIAN PRESS/Jonathan Hayward)

Unprofessional conduct found against two engineers over Mount Polley Mine dam breach

Professional regulator Engineers and Geoscientists BC announced the findings Aug. 10

 

The proposed Blackwater Gold Mine will be constructed and operated approximately 110 kilometres southwest of Vanderhoof. (Artemis Gold Inc photo)
The proposed Blackwater Gold Mine will be constructed and operated approximately 110 kilometres southwest of Vanderhoof. (Artemis Gold Inc photo)
Bjorn Dihle inspects the acid mine drainage flowing into the Tulsequah River from a containment pond filled by effluent from the Tulsequah Chief Mine in B.C., October 2018. The mine cleanup has been a point of dispute between B.C. and Alaska for many years. (Chris Miller photo)

Northwest B.C. mines safe for salmon, Alaska legislators told

Projects developed in Stikine, Taku, Unuk River watersheds

Bjorn Dihle inspects the acid mine drainage flowing into the Tulsequah River from a containment pond filled by effluent from the Tulsequah Chief Mine in B.C., October 2018. The mine cleanup has been a point of dispute between B.C. and Alaska for many years. (Chris Miller photo)
A section of the eastern slopes of the Canadian Rockies is seen west of Cochrane, Alta., Thursday, June 17, 2021. A joint federal-provincial review has denied an application for an open-pit coal mine in Alberta’s Rocky Mountains, saying its impacts on the environment and Indigenous rights aren’t worth the economic benefits it would bring. THE CANADIAN PRESS/Jeff McIntosh

Panel says Grassy Mountain coal mine in Alberta Rockies not in public interest

Public hearings on the project in southern Alberta’s Crowsnest Pass region were held last fall

A section of the eastern slopes of the Canadian Rockies is seen west of Cochrane, Alta., Thursday, June 17, 2021. A joint federal-provincial review has denied an application for an open-pit coal mine in Alberta’s Rocky Mountains, saying its impacts on the environment and Indigenous rights aren’t worth the economic benefits it would bring. THE CANADIAN PRESS/Jeff McIntosh
Pieces of nephrite jade are shown at a mine site in northwestern B.C. in July 2019. THE CANADIAN PRESS/HO-Tahltan Central Government MANDATORY CREDIT

Indigenous nation opposes jade mining in northwestern B.C.

B.C.’s Mines Act requires operators to prepare a plan to protect cultural heritage resources

Pieces of nephrite jade are shown at a mine site in northwestern B.C. in July 2019. THE CANADIAN PRESS/HO-Tahltan Central Government MANDATORY CREDIT
British Columbia’s provincial flag flies on a flag pole in Ottawa, Friday July 3, 2020. Questions facing British Columbia’s mining sector shed light on what’s to come as the province works to match its laws with the United Nations Declaration on the Rights of Indigenous Peoples. THE CANADIAN PRESS/Adrian Wyld

B.C. mining laws raise questions as province looks to implement UN declaration

UNDRIP requires governments to get consent before taking actions that affect Indigenous Peoples

British Columbia’s provincial flag flies on a flag pole in Ottawa, Friday July 3, 2020. Questions facing British Columbia’s mining sector shed light on what’s to come as the province works to match its laws with the United Nations Declaration on the Rights of Indigenous Peoples. THE CANADIAN PRESS/Adrian Wyld
Contents from a tailings pond is pictured going down the Hazeltine Creek into Quesnel Lake near the town of Likely, B.C. on Aug. 5, 2014. (Photo by Jonathan Hayward)

New map details potential environmental threats from B.C. mines

Map editors pressure province to move faster on regulation reforms

Contents from a tailings pond is pictured going down the Hazeltine Creek into Quesnel Lake near the town of Likely, B.C. on Aug. 5, 2014. (Photo by Jonathan Hayward)
Mount Polley Mining Corporation is appealing a $9,000 administrative penalty issued by the Ministry of Environment and Climate Change Strategy regarding it water discharge plans. (Monica Lamb-Yorski file photo)

Mount Polley Mine Corporation appealing $9,000 non-compliance penalty from government

The Ministry of Environment and Climate Change Strategy issued the penalty on Dec. 8, 2020

Mount Polley Mining Corporation is appealing a $9,000 administrative penalty issued by the Ministry of Environment and Climate Change Strategy regarding it water discharge plans. (Monica Lamb-Yorski file photo)
Contract driller Ray Rosenberg, 35, was killed and two other workers were injured in the mudslide that is being investigated by RCMP and the BC Coroners Service. The two injured workers were treated in hospital and released. KTW

Outpouring of support for family of man killed in mudslide at New Afton mine near Kamloops

Contract driller Ray Rosenberg, 35, was killed and two other workers were injured in a mud rush on Feb. 2.

  • Feb 3, 2021
Contract driller Ray Rosenberg, 35, was killed and two other workers were injured in the mudslide that is being investigated by RCMP and the BC Coroners Service. The two injured workers were treated in hospital and released. KTW
Kamloops This Week.

1 dead and 2 injured after mudslide at New Afton mine near Kamloops

Two New Gold employees received non-life threatening injuries and received medical care

  • Feb 2, 2021
Kamloops This Week.
An array of cabinet ministers speak to resource development approvals at B.C. Natural Resources Forum Jan. 21: Energy and Mines Minister Bruce Ralston, Environment Minister George Heyman, Jobs Minister Ravi Kahlon, Indigenous Relations Minister Murray Rankin, Minister of State for Lands and Natural Resource Operations Nathan Cullen and Forests Minister Katrine Conroy. (BCNRF)

B.C.s low-carbon economy plan depends on faster resource permits

13 years to allow a mine won’t work, cabinet ministers reminded

An array of cabinet ministers speak to resource development approvals at B.C. Natural Resources Forum Jan. 21: Energy and Mines Minister Bruce Ralston, Environment Minister George Heyman, Jobs Minister Ravi Kahlon, Indigenous Relations Minister Murray Rankin, Minister of State for Lands and Natural Resource Operations Nathan Cullen and Forests Minister Katrine Conroy. (BCNRF)
The Brucejack mine is 65 km north of Stewart in northwestern B.C. (Pretivm Photo)

B.C. mine executives see bright gleam in post-COVID future

Low carbon drives demand for copper, steelmaking coal

The Brucejack mine is 65 km north of Stewart in northwestern B.C. (Pretivm Photo)
The Tsilhqot’in Nation and Taseko Mines Ltd. say progress had been made in establishing a constructive dialogue regarding the proposed New Prosperity Mine southwest of Williams Lake. (File image)

Standstill on proposed New Prosperity Mine to continue for another year

Tsilhqot’in Nation, Taseko Mines agree to further dialogue

The Tsilhqot’in Nation and Taseko Mines Ltd. say progress had been made in establishing a constructive dialogue regarding the proposed New Prosperity Mine southwest of Williams Lake. (File image)
Twenty-three B.C. mayors have asked Premier John Horgan to enshrine five pillars of action that give natural resource development a key role in B.C.’s post-pandemic economic recovery plan. (Williams Lake Tribune file photo)

B.C. mayors want key role for resource development in pandemic recovery

23 leaders pen letter to premier, asking for inclusion in new policy discussions

Twenty-three B.C. mayors have asked Premier John Horgan to enshrine five pillars of action that give natural resource development a key role in B.C.’s post-pandemic economic recovery plan. (Williams Lake Tribune file photo)
Renegade Prospectors co-founders Rick Curiston and Tina Francis pose near Cayoosh Creek. Former Agassiz resident Curiston recently celebrated one year sober from alcohol and eight years drug-free, loving his new lease on life, family and their love for treasure hunting. (Contributed Photo/Tina Francis)

Former Agassiz DJ turned prospector finds treasure, renewed life in Lillooet

Eight years drug-free, Rick Curiston reflects on his passion for agate, gold hunting

Renegade Prospectors co-founders Rick Curiston and Tina Francis pose near Cayoosh Creek. Former Agassiz resident Curiston recently celebrated one year sober from alcohol and eight years drug-free, loving his new lease on life, family and their love for treasure hunting. (Contributed Photo/Tina Francis)
Heavy metals run out of the Tulsequah Chief mine opening and down to holding ponds next to the Tulsequah River Wednesday, Oct. 8, 2008. Leakage from those ponds can be seen entering the river that flows into the Taku River down stream. (Michael Penn | Juneau Empire)

Funding to support early reclamation work at acid leaking B.C. mine

B.C. Government committing up to $1.575 million for Tulsequah Chief Mine site

Heavy metals run out of the Tulsequah Chief mine opening and down to holding ponds next to the Tulsequah River Wednesday, Oct. 8, 2008. Leakage from those ponds can be seen entering the river that flows into the Taku River down stream. (Michael Penn | Juneau Empire)
Map of EnGold Aurizon sites in Lac la Hache. (EnGold Mines Ltd. image)

EnGold discovers visible gold at two Lac la Hache sites

‘The gold potential of Lac la Hache continues to grow’

Map of EnGold Aurizon sites in Lac la Hache. (EnGold Mines Ltd. image)
Once developed, the Blackwater Project was expected to produce more gold than all other New Gold operations combined. (Submitted image)

New Gold to sell Blackwater Gold project for $190 million

The company made the announcement on Tuesday, June 9.

Once developed, the Blackwater Project was expected to produce more gold than all other New Gold operations combined. (Submitted image)